LOCAL COMMUNITY PROJECTS

Elite Roads is passionate about leading innovative and sustainable projects with local councils to rehabilitate and repair community roads AND INFRASTRUCTURE. WE PRIDE OURSELVES ON Building and maintaining vital community connections.

VICTORIA

Western Roads Upgrade

  • Elite Roads was engaged to rehabilitate 4 stages of Ballan Road as part of the Western Roads Upgrade. Works undertaken were full road reconstruction involving pavement demolition and profiling , new pavements, culvert drainage installation, cement treated pavements, asphalt, Linemarking, signage and guard rail installation.

WYNDHAM CITY council

  • Elite Roads has been working closely with Wyndham City Council since 2017 to maintain council roads. Our shared Environmental and Sustainability targets have aligned in many small projects and see successful results in the trialling of road resurfacing treatments using reclaimed plastics, rubber, steel mill slag and asphalt.

    Elite Roads have resurfaced more than 90,000m2 road network in this time, conducting successful trials of Crumb rubber and high RAP mix types in several locations.

    The benefits of the circular economy mix trials help reduce the amount of rubbish sent to landfill and research also suggests that this asphalt improves the performance of the road compared to standard asphalt. Plus at the end of its life - this asphalt can be recycled.

    Our resources utilised on these works include:

    - Profiling

    - Asphalt supply and lay

    - Trucking

    - Street Sweeping

    - Traffic Management

    Wyndham City Council are always looking to demonstrate leadership to the community by adopting and promoting sustainable building and development suitable for the region’s current and future climate.

moorabool shire

  • Elite Roads was engaged to undertake civil works associated with an 11 lot subdivision on behalf of a private developer providing earthworks, drainage, pavements and services including sewer, watermains, NBN communication and electrical distribution. Project works also encompassed road widening works adjacent to the site and a large diameter stormwater retention system.

FLOOD RECOVERY

  • As part of a $351 million Victorian State Government package to help support communities impacted by the October 2022 Victorian floods, $165 million was allocated to an emergency road repair blitz. These funds will go towards finding and fixing potholes, asphalting, and repairing damaged road surfaces. The package also covered large-scale works including rebuilding roads, bridges and culverts, particularly in the hardest hit areas of Western, Loddon Mallee and Hume regions. The funding will help reconnect communities and get the state’s vital freight industry moving again. Major Roads Projects Victoria worked closely with contractors across the Big Build’s road program in a coordinated effort with Regional Roads Victoria to repair roads impacted by the weather event. Elite Roads have been part of the rehabilitation works on the Hume Freeway, the Western Highway, the Goulburn Valley Freeway and the Murray Valley

WYNDHAM HABOUR

  • Elite Roads was engaged by a private developer to undertake various staged work as part of the overall Wyndham Harbor development. Works included the construction and delivery of the marina Fuel Dock Facility, construction of the boat storage hardstand area, Ohana Beach earthworks and rock revetment wall and the construction of the new Southern Beach Car Park along Beach Road.

NEW SOUTH WHALES

BYRON SHIRE COUNCIL

  • Supply and lay AC10 Type A asphalt to new internal roads then remove and replace damaged sections of Federal Drive and Overlay with a new AC14 Heavy Duty asphalt.

    This private sub-division will be home to large rural lots in some of the northern river’s beautiful countryside, Ballina Civil constructed the 13,500 m2 road way paving the way to these exclusive country lifestyle lots.

  • To supply and apply a S45E Rubber seal then overlay with an AC10 Asphalt

    Harvest Estate Byron Bay, an exclusive new estate along the entry road into Byron Bay, The Elite Roads NSW team placed over 1000 tonnes of asphalt providing access to this highly sort after area.

LISMORE CITY COUNCIL

  • Lismore Bunnings – Bruxner Highway Lismore

    To supply and lay AC10 asphalt to carpark extension and supply and lay AC20 and 14 asphalt materials in 8 layers to rear roadway allowing vehicle access to the new trade centre. Over 1300 tonnes of asphalt were used in this project.

    Elite Roads were successful with our bid to complete the carpark extension and road upgrade to the Lismore Bunnings extension, this project took multiple visits working in with various trades to construct the new 1500m2 carpark and 800mm pavement raise to allow traffic access to the new trade centre.

    5 site visits over 4-month period to complete this project.

TWEED SHIRE COUNCIL

  • Scope to supply and lay AC 10 type 2 asphalt to The Arbour on Burleigh Estate, this was the last stage of this multi stage sub-division consisting of the last 95 lots. This development was constructed by Winslow Construction and Elite Roads were selected to place the asphalt to the 1223m2 road pavement.

Previous
Previous

MAJOR PROJECTS

Next
Next

TECHNICAL